Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Connection Form: | Bolt Connection |
Suppliers with verified business licenses
Steel Structural Component Parameters Table 1
Component Name | Assembly Code | Material | Specification |
steel column | GZ | H section steel | HI600-300-6-10*220 HI500-300-6-10*220 HI500-300-6-10*240 |
steel beam | GL | H section steel | HI750-6-8*200 HI650-6-8*200 HI750-900-8-10*220 |
wind-resistant column | KFZ | H section steel | HI800-6-10*230 HI350-6-8*200 |
roof/floor purlin | LT | C section steel | CC180-2.5-20*70 CC160-2-20*50 CC180-2-20*70 |
Component Name | Assembly Code | Material | Specification |
horizontal support | SC | round steel | D20 |
tie bar | XG | steel round tube | O114*3 O140*4 |
pull-rod | LG | round steel | D12 |
diagonal pull-rod | XLG | round steel | D12 |
awning tie bar | YPXL | steel round tube | O168*6 |
corner bracing | YC | angle steel | L63*4 L50*4 |
Foshan Bingcheng Steel Frame House Co., Ltd.
Bingcheng has garnered a very good reputation in the steel frame house industry since its establishment in 2009.
With over 100 employees, 20% of whom are experienced engineers, Bingcheng has managed to consistently improve the quality of its products, including the sandwich panel production line, C shape steel production line, and welding line. The company has an annual production capacity of 200,000 square meters of steel frame houses.
Bingcheng has exported its products to over 50 countries and regions, including Australia, Angola, Senegal, Kenya, Indonesia, Thailand, Uruguay, Chile, the United States, and the UK. The company remains committed to research, development, and innovation.
1,Q:Are you a factory or a trading company?
We are an integrated manufacturing and trading company with our own production workshops and business team.
2,Q:Where is your factory located?
Our factory is located at Xiaotang Zoumaying, Shishan Town, Nanhai District, Foshan City, Guangdong Province, China.
3,Q:Do your products support ODM?
Both OEM and ODM services are available.
4,Q:What is the standard production lead time?
The production lead time is typically 15-30 days.
5,Q:What trade terms and payment methods do you accept?
We accept EXW, FOB, CFR, and CIF trade terms. Payment methods include L/C (Letter of Credit) and TT (Telegraphic Transfer).