Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Connection Form: | Bolt Connection |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Component Name | Assembly Code | Material | Specification |
steel column | GZ | H section steel | HI600-300-6-10*220 HI500-300-6-10*220 HI500-300-6-10*240 |
steel beam | GL | H section steel | HI750-6-8*200 HI650-6-8*200 HI750-900-8-10*220 |
wind-resistant column | KFZ | H section steel | HI800-6-10*230 HI350-6-8*200 |
roof/floor purlin | LT | C section steel | CC180-2.5-20*70 CC160-2-20*50 CC180-2-20*70 |
Component Name | Assembly Code | Material | Specification |
horizontal support | SC | round steel | D20 |
tie bar | XG | steel round tube | O114*3 O140*4 |
pull-rod | LG | round steel | D12 |
diagonal pull-rod | XLG | round steel | D12 |
awning tie bar | YPXL | steel round tube | O168*6 |
corner bracing | YC | angle steel | L63*4 L50*4 |
1,Q:Are you a factory or a trading company?
We are an integrated manufacturing and trading company with our own production workshops and business team.
2,Q:Where is your factory located?
Our factory is located at Xiaotang Zoumaying, Shishan Town, Nanhai District, Foshan City, Guangdong Province, China.
3,Q:Do your products support ODM?
Both OEM and ODM services are available.
4,Q:What is the standard production lead time?
The production lead time is typically 15-30 days.
5,Q:What trade terms and payment methods do you accept?
We accept EXW, FOB, CFR, and CIF trade terms. Payment methods include L/C (Letter of Credit) and TT (Telegraphic Transfer).